Our workBoard by board, room by room
A deck rebuilt from the footings up, a bathroom taken back to the studs, and a new home finished room by room. Drag the handles to compare before and after.
Deck rebuildOld wood deck to composite, railing and gazebo
Before After
Read how a rebuild goes, and when restaining is the better call, on the deck design and rebuild page.
Bathroom remodelOak vanity and fiberglass shower to tile and glass block
Before After
New construction finish setWalls, ceilings, trim, enamel and stain
Every painted surface in these rooms is finish work: sprayed ceilings, rolled walls, enameled built-ins and lockers, stained cabinetry. Photographed after move-in staging.
In the boothTrim and doors, sprayed
Trim, doors and cabinet doors come off the house and go on racks, get sprayed in a controlled space, and go back on with a finish a brush cannot match. It is how the cabinet and trim enamel work in the rooms above was done.
Want to see something specific, like a cedar restain or an exterior color change? Call (763) 318-6193 and ask. We will send photos from a job like yours.
Free written estimate
Want your house in this gallery?
Tell us what needs paint and what looks rotten. We will walk it with you and send a written estimate that lists the repairs as line items. No pressure and no invented urgency.